Step by Step Instructions for Installation

Click on an image to start slide show
(Ensure this page has loaded completely first)

Overview with swing head on ground
Overview with swing head on ground
Location shot
Attaching legs
Centering swing - location
Centering swing - location
Leg positions marked - ready to dig holes
Swing moved so holes can be dug
Swing moved so holes can be dug
Digging holes
Digging holes
Base support for leg extensions
Taking level of finished soft fall height
Adjusting level for leg extensions
Levelling bottom of holes
Leg extensions in holes
Swing placed on leg extensions - one leg at a time
Swing set up on leg extensions
Final level checks (both ways)
Swing frame concreted in
Drop arms installed
Swing capsule positioned
Capsule attached to drop arms with temporary pins
Pins replaced by bolts
Attach hardboard spacer panel
Plumb swing drop arms
Bring capsule forward by 250mm
Locate and attach frame to ramp
Dig holes for ramp
Dig hole for signage pole
Attach leg extensions to ramp hinges
Make sure that there is 160mm from front of apsule to base of ramp
Ensure ramp hinge support bracket is plumb
Concrete in ramp legs
Concrete signage post
Position galvanised sheeting over ramp
Level off front of ramp before galvanised sheeting is installed
Level off front of ramp before galvanised sheeting is installed
Peg galvanised sheeting in place
Level galvanised shheting at required height
Fit torsion rod
Fit torsion rod by lifting ramp at 60 degree angle
Mark top and centre
Locate scotch plate
Locate scotch plate
Locate scotch plate
Road base sub ground delivered and spread
Road base sub ground delivered and spread
Road base sub ground delivered and spread
Road base sub ground delivered and spread
Rubber layer going down
Rubber layer going down
Rubber layer going down
Rubber layer going down
Rubber layer going down
Rubber layer going down
Rubber layer going down
Sealing ramp well
Sealing ramp well
Green top coat applied
Green top coat applied
Green top coat applied
Green top coat applied
Green top coat applied
Safety fence installed
Job complete - ready to fly!